Project Case Study: AT-2000 Raise Boring Machine Successfully Completes Ventilation Shaft in Guinea
Project Location
Mamu Tunnel Project, Guinea, West Africa
Project Type: Tunnel Ventilation Shaft Construction
Equipment Model
AT-2000 Raise Boring Machine
Developed by Hunan Yier Mining Technology
Technical Parameters
Shaft: 3# Ventilation Shaft
Drilling Operations: Pilot-Hole Drilling and Reaming
Geological Conditions: Hard and unstable rock formations with multiple fractured zones
Key Geological Challenge: Fractured rock zone encountered at a depth of 53 m
Project Challenges
Complex geological conditions involving hard rock, unstable formations and fractured zones
Potential risks of ground collapse and water inflow
Reduced reaming efficiency and larger rock fragments in fractured formations
Language barriers between Chinese engineers and local Guinean personnel
Limited material supplies and unreliable network connectivity at the project site
Solution and Results
Adaptive Drilling Control: Yier Mining's on-site service engineer adjusted drilling speed and feed pressure and applied low-pressure pullback to help the machine pass through the fractured rock zone at 53 m depth.
Continuous Condition Monitoring: Discharged rock fragments were monitored throughout reaming to support timely adjustments to operating parameters.
Full-Process Technical Support: On-site assistance covered machine positioning, rig setup, pilot-hole drilling, reaming-head installation, reaming, machine recovery and reaming-head removal.
Local Operator Training: Guinean technicians received practical training in equipment operation and construction procedures, helping develop the skills needed for future independent operations.
Successful Shaft Breakthrough: The AT-2000 Raise Boring Machine successfully completed the 3# ventilation shaft, overcoming challenging geological conditions and on-site operational difficulties.
Customer Feedback
The project demonstrated effective cooperation between the Chinese and Guinean project teams. The supplied project report highlights the value of Yier Mining's on-site technical assistance and practical training.
Key Takeaway
The Mamu Tunnel Project demonstrates the AT-2000 Raise Boring Machine's application in challenging geological conditions, supported by adaptive drilling control, on-site engineering expertise and hands-on training for local technicians.