Case: ATM-1000L Slot Raise Boring Machine — Pangang

Project Case Study: ATM-1000L Slot Raise Boring Machine at Pangang

Project Location

Country: China

Project: Pangang Mining Project

Project Type: Vertical Slot Raise Construction for Deep-Hole Blasting

Equipment Model

ATM-1000L Slot Raise Boring Machine

Technical Parameters

Number of Raises Completed: 9

Total Drilling Length: Over 200 m

Drilling Depth: 23–25 m per raise

Inclination: 90° vertical

Reported Deviation Rate: 0.1%

Average Drilling Efficiency: 1–1.5h/m

Rock Conditions: Hard granite with interbedded layers, fault zones, and fractured formations

Minimum Spacing Between Adjacent Holes: 550 mm

Working Chamber Width: 4.2 m

Project Challenges

Restricted Underground Working Space

The working chamber was only 4.2 m wide, limiting equipment positioning, installation, and movement underground.

Hard Rock and Complex Geological Conditions

Hard granite, combined with interbedded layers, faults, and fractured zones, created challenges for rock breaking, drilling stability, and vertical alignment.

Precision Requirements and Closely Spaced Raises

All nine raises required a vertical design. With only 550 mm between adjacent holes, accurate positioning and deviation control were essential to reduce the risk of hole breakthrough and maintain borehole integrity.

Blasting Efficiency and Rework Control

Some areas experienced unsatisfactory blasting results, creating a need for supplementary drilling and increasing time and cost pressures.

Solutions and Results

Customized Site Preparation and On-Site Technical Support

Before equipment delivery, Yier Technology's service team provided guidance on working chamber and foundation layout to optimize the limited operating space.

Service engineer Guo Yi supported equipment transport underground, installation, commissioning, trial operation, and maintenance training. Over the course of more than 200 m of drilling, the team also trained two operators to independently operate, maintain, and service the equipment.

Precision Drilling in Hard Granite

The project team worked with mine personnel to repeatedly check drilling alignment and adjust operating procedures and feed speed according to site conditions. The ATM-1000L's fine positioning adjustment system and multi-angle positioning capabilities helped the team correct drilling deviations and maintain alignment.

The reported overall deviation rate was controlled to 0.1%, supporting the precision requirements of vertical raise construction.

Optimized Positioning for Closely Spaced Holes

With adjacent holes spaced just 550 mm apart, the team carefully planned equipment positioning and assessed hole spacing and potential deviation risks. Drilling parameters and borehole layout were adjusted to help protect borehole integrity and reduce the risk of adjacent-hole breakthrough.

The team also optimized blasting parameters and drilling layouts to address areas requiring supplementary drilling, aiming to reduce rework and improve overall construction efficiency.

Verified Project Results

Since commissioning on May 26, 2025, the ATM-1000L has completed nine vertical raises totaling over 200 m, with individual raise depths of 23–25 m. Average drilling efficiency was reported at 1–1.5 hours per meter, and the overall deviation rate was reported at 0.1%.

The project demonstrates the ATM-1000L's capabilities in hard-rock drilling, precision alignment, and confined underground working environments, supported by on-site engineering services and operator training.

Related Products


YIER TECHNOLOGY

Contact Us

What's app: +86-186 7483 6863 Mia Su

What's app: +86-198 9624 1275 Betty Zhou

Company address: No.320 Changqing Road,Kaifu District,Changsha City,Hunan Province,China YIER Science and Technology Industrial Park

Submit
No data

No data

business license

Powered by www.300.cn ChangSha