Case: AT-2000 Raise Boring Machine in Xinjiang — Dunde Iron Mine

Project Case Study: AT-2000 Raise Boring Machine Completes 214 m Deep Drainage Raise at Dunde Iron Mine, China

Project Location

Country: China
Mine: Dunde Iron Mine, Hejing County, Xinjiang
Altitude: 3,788 m above sea level
Project Type: Underground Mining – Vertical Drainage Raise Construction

Equipment Model

Equipment Model: Yier Technology AT-2000 Raise Boring Machine
Application: Deep vertical drainage raise construction in high-altitude, cold-region mining conditions

Technical Parameters

Raise Diameter: 1.4 m

Drilling Depth: 214 m

Inclination: Vertical (90°)

Altitude: 3,788 m

Rock Conditions: Hard granite and ice-rich, unstable permafrost

Reaming Period: June 28 – July 17

Reaming Duration: 19 days

Average Reaming Rate: Over 11 m/day

Project Challenge

High-Altitude Conditions: Reduced oxygen levels and low temperatures presented challenges for equipment performance and personnel safety.

Unstable Permafrost: Ice-rich, deformable frozen ground increased the risk of foundation settlement and ground instability.

Hard Rock and Fractured Formations: Hard granite and rock fractures caused water and cuttings return difficulties during pilot drilling.

Solution and Results

Reinforced Foundation for Permafrost Conditions

The service team removed the surface permafrost and constructed a 1 m thick concrete foundation reinforced with embedded No. 30 national-standard I-beams, providing a stable base for equipment installation and drilling.

Optimized Pilot Drilling

To address poor water and cuttings return in fractured formations, the team applied staged cement grouting to seal gaps. A low-pressure, high-rotation drilling method helped reduce drill-bit deviation and improve pilot-hole stability.

High-Efficiency Deep Raise Construction

The AT-2000 successfully completed reaming of the 1.4 m diameter, 214 m deep vertical raise in just 19 days, averaging over 11 m of advance per day.

The project demonstrated the machine's ability to perform deep raise construction under demanding high-altitude, cold-region, and hard-rock conditions.

Customer Feedback

The successful completion of the 214 m drainage raise demonstrated the AT-2000's suitability for challenging high-altitude mining operations.

Related Products


YIER TECHNOLOGY

Contact Us

What's app: +86-186 7483 6863 Mia Su

What's app: +86-198 9624 1275 Betty Zhou

Company address: No.320 Changqing Road,Kaifu District,Changsha City,Hunan Province,China YIER Science and Technology Industrial Park

Submit
No data

No data

business license

Powered by www.300.cn ChangSha