Case: AT-3000L Raise Boring Machine in Zambia — Chambishi Copper Mine
Hotline:
Project Case Study: AT-3000L Raise Boring Machines at Chambishi Copper Mine, Zambia
Project Location
Country: Zambia
Mine: Chambishi Copper Mine
Project Type: Underground Mining – Raise Boring for Ore Passes and Backfill Holes
Project Period: April 29, 2024 – December 31, 2025
Equipment Quantity: 2 AT-3000L Raise Boring Machines
Equi pment Model
Equipment: AT-3000L Raise Boring Machine
Manufacturer: Hunan Yier Mining Technology Co., Ltd.
Technical Parameters
Standard Raise Diameter: 3 m
Maximum Reported Pilot Hole Depth: 280 m
Rock Conditions: High-hardness granite and quartzite
Typical Advance Rate: 6 m/day
Peak Advance Rate: 7.3 m/shift and 11 m/day
Measured Raise Deviation: 0.1%–0.4%
Project Challenges
Hard Rock Formations: High-hardness granite and quartzite increased drilling resistance and placed greater demands on equipment durability and drilling performance.
Groundwater Interference: Water encountered during drilling added complexity to underground construction.
Large-Diameter, Deep-Hole Operations: The project required 3 m diameter raises and deep boreholes, demanding stable operation and accurate alignment.
Overseas Maintenance Requirements: Rapid technical support and effective troubleshooting were essential to minimize downtime and maintain project progress.
Solution and Results
High-Precision Raise Boring in Hard Rock
The E2-2 ore pass, with a diameter of 3 m and a depth of 155 m, achieved a deviation distance of only 9 cm, corresponding to a reported deviation rate of approximately 0.1%.
Backfill-hole construction
Total completed length: 351.8 m
Individual reported sections: 214 m, 32 m, 33.4 m, 37 m, and 35.4 m
3 m diameter raise construction
Five raises planned or undertaken
Four completed raises: 96.7 m, 109.5 m, 75 m, and 147.7 m
Fifth raise: 155 m planned length, with 50 m of reaming completed as of the reporting date
Reported cumulative construction footage: 830 m
On-Site Technical Support and Rapid Troubleshooting
During operation, a sudden failure occurred when a hexagonal socket screw fractured, causing the machine and drill rod assembly to drop.
On-site engineer Wang Chaoqun carried out an emergency repair by welding four 40 mm steel rods to reinforce the connection between the gearbox and the machine head, restoring equipment operation.
This incident highlights the importance of experienced on-site engineering support, practical troubleshooting capabilities, and timely maintenance in overseas mining projects.
After-Sales Service and Technical Support
To support long-term operations at Chambishi Copper Mine, Yier Technology assigned experienced engineer Wang Chaoqun to the project site.
His responsibilities included:
Equipment operation guidance
On-site troubleshooting and emergency repairs
Equipment performance optimization and adjustments
Technical support for ongoing underground construction
This on-site service model helped address the challenges of cross-border maintenance and enabled faster technical responses to equipment issues.
Yier Technology – Reliable Raise Boring Solutions for Demanding Underground Mining Projects.
Related Products